9/18/2023 0 Comments Din en 10204 type 3.1![]() You would supply the machine shops inspection results on the cert and the original mill test results. ![]() With the information that I have read, I just wanted to make sure I understand the process correctly. ![]() I have read various threads on this forum in regards to EN 10204 3.1 certificates. The machine shop would then copy and include the information provided on the original MTR onto that certificate and send it to the customer I am not exactly sure what other Test Results could be included on the Machine Shops Inspection Test Certificate. The machine shop would then generate its own Inspection Certificate in accordance to EN 10204 3.1. After receipt, the machine shop would perform the necessary machine shop operations per the customers specifications drawings.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |